MacNRG Energy Careers

Search Jobs Exploration and Production Energy Resume Energy CV

Senior Reservoir Engineer Thermal SAGD Energy Jobs Calgary Alberta Canada CA

Senior Reservoir Engineer Thermal SAGD Energy Jobs  Calgary, AB

Excellent opportunity for an experience Senior Reservoir Engineer to join our client an International oil and gas company with operations.  The company aims to provide long-term growth and continue to develop technologies and manage projects that will meet the world’s energy and climate changes in a sustainable way.

Our client currently holds a substantial land base of oil sands leases in Northern Alberta which will result in full field development producing over 200,000 bbl/d. The Oil sands Pilot is coming on stream in 2010 at 20,000 bbl/d with plans for further expansion, and the current 10,000 bbl/d SAGD facility is on schedule. The second Oil sands Project is in the planning phase for developing a 40,000 bbl/d commercial plant. The objective of this position is to provide reservoir engineering and simulation support to the development of oil sands assets by using SAGD, solvent co-injection and/or other novel thermal recovery technologies. While you will report directly to the Manager, Reservoir Studies, you  may also be seconded to other Division or Department on a short-term basis.

Duties and Responsibilities:

Conduct numerical modeling, subsurface studies and exploitation planning. Generate production forecasts using reservoir simulation, production analysis and other reservoir engineering techniques. Optimize well pattern layouts, development sequences and well placement. Formulate fit for purpose reservoir surveillance plans to collect reservoir data. Analyze subsurface and surface field data to obtain key reservoir/well performance parameters. Perform regional studies (including analyzing competitor public data) to improve understanding of the SAGD process. Generate risked OBIP, production profiles, recoverable volumes for reservoir management. Participate in the reserve booking process including the evaluation, documentation, presentation and the reporting steps. Liaison with external partners and regulatory agencies. Support regulatory processes including technical justifications to the regulator and offsetting operators. Formulate and implement laboratory data acquisition programs including costing and vendor selection. As an asset team member, actively participate in revising development plans and capital cost forecasts as required. Provide input to economic evaluations, new land acquisition and joint venture opportunities as required. Assist in mentoring less experienced Engineers, EITs and intern students.

Minimum Qualifications:

Ideal candidates must be a Canadian Citizen or be a Canadian Landed Immigrant. Bachelor of Science degree in Engineering and APEGGA membership (P.Eng. designation) is required. 10+ years experience in reservoir engineering and related experience working within an integrated team including Geology, Geophysics and other Engineering disciplines. 10 years minimum experience with the SAGD development process is required. Reservoir experience in thermal recovery of bitumen is required. Exposure to steam solvent co-injection and/or Gas-Over-Bitumen is preferred. Experience with STARS, Exotherm or Eclipse Thermal simulation is required. Strong subsurface technical management skills. Ability to provide recommendations under varying timelines and working with sometimes limited or conflicting data. You must be a self-starter and be able to handle multiple projects concurrently.

Click here to apply online

Visit Energy Careers Job Board

International Energy Engineering Jobs RSS Feed

International Energy Engineering Energy Resume Energy CV RSS Feed

For more information email us

Senior Staff Geologist Jobs Calgary Canada CA

Senior Staff Geologist
Calgary, Alberta
Our Client, a proven successful Independent Oil and Gas Company currently has one opening for a Senior Geologist with experience in Resource Plays. They are looking for an individual  focused on creating value through the successful development of assets in unconventional type plays.Overall Responsibilities and Key Accountabilities:


• Responsible for a strategic growth area in a multi-horizon deep basin gas setting;
• Drive the exploration and development of our existing land positions;
• Key skills are the correlation and calibration between multiple data sources (logs, cuttings, core, geophysics and engineering) into comprehensive, well supported recommendations;
• Very organized with a highly structured and effective workflow, designed to resolve uncertainty and move analysis forward;
• Tenaciously monitor the area for competitor activity and new opportunities;
• A strong business acumen that can participate in tactical planning meetings as well as quickly filter opportunities based on strategic fit, materiality and economic parameters is required; and
• Share technical expertise and learnings with peers, and across disciplines and mentor junior staff.

Knowledge, Skills and Experience Required:
• A minimum of 10 years of exploitation and exploration industry related experience and a registered APEGGA member;
• A solid understanding of geology, including knowledge of stratigraphy, structure, and trapping mechanisms for various conventional and unconventional resource play types;
• Varied experience throughout the basin having shown success in exploration;
• The ability to assimilate key information and incorporate the knowledge of other team disciplines, such as land, geophysics and engineering, in identifying, assessing and executing opportunities;
• Strong petrophysical, sequence stratigraphic and mapping skills, and an understanding of DST and production and geophysical data;
• Experience with multi-frac horizontal wells would be an asset;
• Ability to work with a variety of technical digital platforms (e.g. Accumap, GeoScout, Petrel etc);
• An ability to provide fresh approaches to existing plays;
• Excellent communication and team work skills;
• Driven to deliver value to the Team through solid technical recommendations; and
• Ability to foster strong internal and external relationships.

Click here to apply online

Visit Energy Careers Job Board

International Energy Engineering Jobs RSS Feed

International Energy Engineering Energy Resume Energy CV RSS Feed

For more information email us

Senior Staff Petrophysicist Energy Jobs Calgary Canada Houston Texas

Senior Staff Petrophysicist Energy Jobs Calgary Canada Houston Texas
A strong Growth oriented E&P Company is seaching for a Senior Petrophysicist to join their team.With an office in Calgary, Alberta, this Company is a large integrated energy and energy-related company, with upstream, midstream and downstream segments operating in the United States, Western Canada, to offshore Canada’s East Coast,  China, Indonesia and several other international areas.
They are a financially disciplined, integrated energy company with a consistent record of strong operational and financial performance. They provides investors with a top quartile yield and prudent business model which combines quality investment and operational excellence. Management has a proven track record of executing projects on time and on budget, achieving project goals and creating shareholder value.

This is a senior professional position which, as part of the Petrophysical Team, provides petrophysical support to Business Units and Exploration Districts. In the role of Senior Staff Petrophysicist, you will evaluate petrophysical data from the Company and partner operated wells for the purpose of establishing drill stem test intervals, completion and/or abandonment decisions, perforation intervals, reservoir potential and reserves estimates. An important aspect of the position is to conduct multi-well analysis projects in support of Enhanced Oil recovery (EOR) and unconventional resource play projects.  Specific responsibilities of the position are:

  • Design and monitor formation evaluation programs
  • Ensure quality of load data
  • Conduct petrophysical analyses on single wells and on multi-well projects
  • Mentor and advise staff on petrophysical data and interpretations


Qualifications:

  • A Bachelor’s degree in Geology, with a minimum of 10 years of experience in a combination of logging operations, log analysis, and/or geology
  • Currently registered, or eligible for registration with The Association of Professional Engineers, Geologists, and Geophysicists of Alberta (APEGGA)
  • Demonstrated proficiency in designing and monitoring logging programs and conducting petrophysical evaluations of single wells and multi-well projects
  • Experience in the evaluation of unconventional reservoirs
  • Good interpersonal skills and the ability to work in a multi-disciplinary team environment
  • Well developed oral and written communication and presentation skills
  • Good organizational skills to handle a wide variety of tasks and priorities
  • Ability to mentor and train less experienced staff on petrophysical issues
  • Strong computer skills with experience in Interactive Petrophysics is an asset


 

Click here to apply online

 

Click here for more information

 

Visit Energy Careers Job Board

International Energy Engineering Jobs RSS Feed

International Energy Engineering Energy Resume Energy CV RSS Feed

For more information email us

Engineering and Commissioning Manager Energy Jobs Calgary Canada CA

Engineering and Commissioning Manager Energy Jobs Calgary Canada CA Do you have 15+ years of experience in progressive Engineering, Project Management and Execution oil and gas projects?

If you have a passion for engineering and innovation that strives for results this may be the opportunity for you!

This E&P Company is looking for an Engineering Manager, where you will be responsible for the management of all engineering aspects of this oil sands project. You will also be responsible the consistency, quality and integrity of the engineering deliverables for all disciplines, with a focus on innovation within engineering as a means to improve construction execution.

This Oil Sands Business Unit is looking for a Engineering and Commissioning Manager to lead and direct operations during commissioning and start up.  In this role, you will provide technical and operational input during Detailed Engineering to improve the effectiveness of the startup period. You will act as a key interface point between Operations and Construction to ensure a smooth transition at the critical time frame of construction completion and initiation of operations. Reporting to the Area Manager, you will be wholly responsible for the planning, preparation, and execution of the field and plant facilities commissioning and startup.

 

Specific responsibilities include:

  • Prepare the initial CSU cost estimate and track performance against the cost estimate
  • Identify commissioning systems, prepare detailed work plans, schedule commissioning activities and execute these activities in the field
  • Work with construction to clearly delineate the most effective strategy for simultaneous construction and operations activities during the construction completion phase
  • Work with the Engineering, Procurement and Construction (EPC) contractor to identify design requirements and improvements to enable an effective start up
  • Work with the EPC contractors to ensure turnover documentation is identified and provided to operations on a timely basis
  • Identify commissioning spares requirements
  • Provide guidance to operations staff on operating procedures and processes for operator training
  • Work with operations to ensure policies, procedures, processes, and practices are followed

Our ideal candidate will have the following qualifications:

  • A technical diploma in a related engineering discipline and ASET Certified Engineering Technologist designation is preferred
  • A First Class Steam Ticket would be an asset
  • 15+ years of process operations experience with a leadership role in at least 2 process startups is required
  • Operations and maintenance leadership experience is required
  • Steam Assisted Gravity Drainage start up experience would be an asset
  • Ability to read Process and Instrumentation diagrams
  • Planning and estimating skills would be an asset
  • Proven track record of preparing equipment and process system set ups, startups, and operating practices
  • Demonstrated ability to advise on strategic decisions, influence successful outcomes, guide decision-making and problem-solving
  • Timely decision making during critical operational cycles
  • A proven commitment to safety and the environment

Certified Training:

  • Hydrogen Sulphide (H2S Alive)

 

Click here to apply online

Visit Energy Careers Job Board

International Energy Engineering Jobs RSS Feed

International Energy Engineering Energy Resume Energy CV RSS Feed

For more information email us

Thermal Geomodeler Energy Jobs Houston Texas Calgary Canada

Thermal Geomodeler Energy Jobs Houston Texas Calgary Canada This is an excellent opportunity to provide input into the development plan, reservoir modeling and tactics to optimize reservoir performance and performance monitoring.

Key Duties and Contributions will Include:

Working in a collaborative environment to develop 3-D models of the Formation, using the Petrel software suite, based on sound knowledge of geostatistics and modeling theory

  • Integrating geology and reservoir engineering principles into the geocellular models
  • Producing up-scaled data sets of the 3-D models for input into thermal flow simulators
  • Understanding key elements regarding cap-rock integrity
  • Keeping abreast of new oil sands knowledge and the performance of existing thermal projects
  • Championing and supporting oil sands research and development programs

Qualifications: Our ideal candidate will have the following qualifications:

  • A Bachelor’s degree in Geosciences, a Master’s degree would be an asset
  • Be a registered Professional Geologist (or eligible to attain Professional status with APEGGA)
  • A minimum of 12 years of progressive skill development in creating and applying geomodeling to developing thermal oil recovery projects
  • Practical experience with 3-D thermal reservoir modeling techniques, including a solid skill level using Petrel software
  • Solid understanding of geostatistical methods
  • Good knowledge of clastic sedimentology and stratigraphy
  • Versed in the various types of clastic depositional models
  • Good knowledge of wireline and MWD/LWD logs as well as formation evaluation
  • Experience in the interpretation and application of geophysics in constructing geological models
  • Strong ability to assess and understand the impacts of new data and react in a timely fashion
  • Excellent organizational and planning skills to set and exceed established goals, schedules, and deadlines, often under tight time lines and with shifting priorities
  • Proven ability to work in a team environment dealing with people from various disciplines
  • Self-starter with a positive attitude and a bias for achieving results
  • Strong computing skills with proficiency in Microsoft Office applications
  • Strong interpersonal and communication (verbal and written) skills to effectively interact with a variety of  personnel, and other industry participants, both internal and external.

Click here to apply online

Visit Energy Careers Job Board

International Energy Engineering Jobs RSS Feed

International Energy Engineering Energy Resume Energy CV RSS Feed

For more information email us

Energy Resume Energy CV Senior Production Facilities Engineer Experienced in Western Canada CA

Energy Resume Energy CV of Candidate 12434.  Senior production and facilities engineer with over 10 years of experience in the WCSB.  Areas of focus have included; Foothills Deep Gas, Plains Shallow Gas, and Plains Heavy Oil. Working in each of these areas has been able to build a strong foundation in production engineering/operations, facilities engineering/operations, completions engineering and workover operations.  Consistently demonstrated exceptional communication and project management skills.  Reliably develop and execute efficient capital and maintenance programs to maximize value extracted while focusing on operational cost reduction.  Self-motivated and highly adaptable to standards and processes where they exist or eager to implement or improve processes where they are lacking or don’t exist, especially relating to safety, regulatory and environmental compliance.

Professional Experience

Major Energy Firm, Calgary Alberta                                                                                                                                            2005 – 2009

Production / Facilities Engineer, Bighorn South SBU

  • Production and facilities engineer and project manager on the Berland (30 mmcfd), Edson/Carrot Creek (20 mmcfd) and Aurora/Ferrier (18mmcfd) unconventional gas, sour gas and conventional oil areas in the Canadian Foothills Gas Region, with capital programs in the $80-$110 MM annually.
  • Involved in the planning, developing and budget preparation of 1, 2 and 5 year full field capital and maintenance strategies with multidisciplinary teams including G & G, development engineering, surface land, joint interest and operational staff.  Worked with operations on facility optimization and maintenance programs including initiating operating cost reduction and greenhouse gas (GHG) reduction strategies.
  • Worked closely on the design, scoping, estimating, AFE management and execution of these projects with EPC, construction, safety and operations groups. (including commissioning, HAZOP, management of change (MOC), shutdown key reviews and conducting extensive lookbacks) 
  • Worked closely with drilling and completions to improve well on-stream cycle times through concurrent operations (reducing flare and greenhouse gas (GHG) emissions reduction initiative)
  • Worked closely with surface land to update area operating agreements (AOA’s), resolve ungulate restriction issues and ensure all D56 regulatory requirements have been met for facility and pipeline projects.
  • Provided support to acquisitions and divestitures which included review and evaluation of wells, pipeline systems and facilities.  Worked on the oil property sale and the gas property divestiture package.
  • Coordinated bi-monthly area asset team meetings in the field including well reviews and facility optimization reviews, attended monthly field safety review meetings
  • Responsible for new well production tracking, optimizing and making recommendations for well completions.
  • Responsible for developing continued optimization strategies for gas well de-liquification including continuous installation of plungerlift, annular well control systems and wellsite booster compression.
  • Worked with operations and Energy Efficiency Initiative group to install REM Slipstream Technology in the Ferrier 12-33 sour gas booster site (capture vented hydrocarbons, a greenhouse gas (GHG) emissions reduction initiative).
  • Continuous redesign and improvement of wellsites and padsites towards developing standard print packages.   Collaborated with operations to design a near zero emissions wellsite (a GHG emissions reduction initiative).
  • Initiated, installed and commissioned approximately 11km of 6-inch Fibrespar composite pipe which realized a 10% savings in cost over steel and was 20% faster in installation.
  • Successfully installed and commissioned the Leland 30 mmcfd grassroots booster compressor and flow splitter.  This $10MM joint interest project was commissioned on time and realized 5 mmcfd of incremental gas production. 

Completions Engineer, Gas SBU                                                        2004 – 2005

  • Primary completions lead engineer for the 2005 Shallow Gas infill capital program consisting of 560 new shallow gas wells. Well workover activity included identifying 150 re-fracs and 100 re-completions.  Suffield gas had an overall capital budget of $110 MM.
  • Responsible for designing and programming of 400 shallow gas wells for multiple zone completion and stimulation, worked with multidisciplinary team to develop and coordinate area budgets for completions and workover activity.
  • Worked with business services on hiring of service rigs and completion services, cost estimate, AFE generation and taking well calls.  Supervised two lead field completion consultants (up to eight total).
  • Worked with multidisciplinary team to identify new well and workover candidates, supervised and mentored junior staff and summer interns on programming new well and workover candidates.
  • Coordinated bi-weekly field meetings with completion consultants, operations, area construction coordinator and area safety coordinator to review completion and construction crew movement and to conduct a safety review.
  • Implemented new frac and perforating strategy developed by team to help reduce per well cost while focusing on continuous load leveling throughout the year.
  • Worked directly with other SBU’s (Brooks area SBU’s) to obtain and better utilize area frac services, including logging, perforating, tank storage and trucking services.

Production / Facilities Engineer, Gas SBU                                     2002 – 2004

  • Primary SBU production / facilities engineer for new facility, facility modification, facility optimization, new pipeline installation, gas well de-liquification and gas gathering system optimization for the areas.
  • Worked closely on the design, scoping, cost estimating, AFE management, accrual, project management and execution of several capital programs and operations projects with EPC, construction, safety and operations groups (including commissioning, HAZOP, and conducting extensive lookbacks).
  • Successfully installed 3550hp Koomati grassroots booster station along with facility modification of the existing Koomati main station.  This $7.3MM project increased capacity to 60 mmcf/d in the Koomati area.
  • Siphon String/Tubing Pull program – $2MM well optimization initiative requiring the removal of 2 3/8 tubing from 125 shallow gas wells and the installation of 0.7” HDPE in 400 wells for gas well de-liquification.
  • Successfully installed and commissioned an additional 4700hp of natural gas compression to the existing CD compressor station.  This $2.6MM project had an overall net system gain of 3.5 mmcfd.
  • CD Sales Compressor Station & CD Spine Project ($4.5MM project) – Successfully installed and commissioned a 2350hp grassroots compressor station capable of 50 mmcfd process and the installation of 2 miles of 16-inch mainline with 6 miles of 6-inch pipeline laterals tying in 4 gas production batteries.

Major Oil and Gas Firm, Calgary Alberta

Production Engineer, Gas Southeast BU                                      2001 – 2002

  • Production engineer responsible for gas well de-liquification, gas gathering and facility system optimization.
  • AB-11/B1-5 Siphon String Project – evaluated the effectiveness of siphon strings on low gas well producers, set up for 2002 siphon string project.

Production Engineer, Oil Southeast BU                        1998 – 2001

  • Production engineer responsible for oil well optimization and workover maintenance programs for the South Jenner, Dieppe, Deberg and Dakota conventional heavy oil fields (under active waterflood), which produced approximately 14,000 bopd.
  • Worked directly with service rig consultants on developing workover programs, cost estimating, AFE generation and taking well calls.
  • Worked with vendors to obtain contracts for service rig usage, purchasing rotary screw pumps, electric submersible pumps and surface drivers and motors.
  • Evaluated and identified well optimization candidates for speed up and pump upsizing.  Initial well completion design for artificial lift (ESP, PCP and beam pump), power optimization, waterflood management (through injector recompletions), cost estimating and project management.
  • Successfully re-completed 13 oil wells over to water injection increasing overall field injection capacity to 31,000 m3/d in South Jenner.
  • Successfully initiated the installation of primary three phase above ground and below ground power to the area.  This 5.0 MW of additional power allowed for the conversion of all gas driven pumping systems into electrical systems. Worked with operations to convert 65 natural gas pump drivers over to electric.  Worked with operations to convert 50 beam pumps over to progressive cavity pumps.
  • Successfully installed the first two electric submersible pumps (ESP’s) in South Jenner for oil well production optimization purposes.

Education:

Bachelor of Science in Petroleum Engineering,

University of Alberta, Edmonton, Alberta, Canada 1998

Software Skills:

Microsoft Office, PVR, PVR Wizard, PEEP, Accumap, PIPESIM, WEM, C-FER, FAST Piper and Virtuwell.

Certifications & Memberships:

  • Association of Professional Engineers, Geologists, Geophysicists of Alberta – Professional Engineer
  • Emergency First Aid CPR Level A (expires Aug 2011),
  • H2S Alive (expires Aug 2011), W.H.M.I.S. and TDG
  • Member of the Petroleum Society of the CIM,
  • Society of Petroleum Engineers, and Gas Processors Association of Canada

References Available Upon Request

Please send me more information on this candidate

Energy Resume Energy CV Senior Reservoir Engineer with extensive Modeling, Reservoir Simulation, EOR, IOR Experience Seeking Gulf Coast Area Opportunities

Energy Resume Energy CV of Candidate 99123.  Senior Reservoir Engineer with extensive, modeling, reservoir simulation, EOR and IOR experience seeking new career opportunities in the Gulf Coast.

HIGHLIGHTS OF QUALIFICATIONS

  • 18 years of broad-based experience in oil and gas reservoir engineering.
  • Experienced with modeling, numerical simulation, reservoir performance analysis, optimization of fields, development planning, economic evaluation, forecast production and reserve estimation.
  • Substantial experience in EOR/IOR techniques including sweep conformance, CO2 flood and chemical flood such as polymer, Gel, CDG, foam, surfactant and SP/ASP.
  • Skilled at conventional reservoir engineering techniques including reservoir characterization, volumetric analysis, material balance, reservoir fluid phase behavior, decline-curve, well test, PVT, special core analysis, sold deposition and integrated reservoir studies.
  • Strong CMG, IPM (REVEAL), UTCHEM, ECLIPSE, MS-Office and programming experience.

PROFESSIONAL EXPERIENCE

Senior Reservoir Engineer (March 2008- Present)

  • Perform various reservoir engineering projects for major oil companies such as Chevron, BP, Shell, OXY, Woodside (Australia), Husky (Canada) and Rosneft (Russia).
  • Primarily be responsible for reservoir engineering analysis and evaluation, project design, modeling and simulation for water flood and chemical IOR/EOR.
  • Review field performance with regard to recovery and production efficiencies. Diagnose poor sweep efficiency of water flood. Find out solutions of sweep conformance, Evaluate alternative development schemes in operated fields from perspective of recovery and production.
  • Plan and design lab tests such as core flood and slim tube for water shut off and profile control.
  • Responsible for reservoir performance analysis of mature water flood field. Conducted design and process implementation of sweep conformance projects. Successfully developed criteria and simulation methods for BrightWater sweep conformance new technology.
  • Built reservoir dynamic model and run simulation for water flood and BrightWater projects.
  • Conducted customer service and business development by reservoir engineering technology support and consultation.

Senior Reservoir Engineer and Project Manager (November 2006 – March 2008)

  • Supervised projects to usage of petroleum engineering protocols consisting of project planning, data interpretation, process troubleshooting, quality assessment/quality control and reporting.
  • Carried out feasibility studies for various EOR schemes include CO2 flood, water and chemical flood, hydrocarbon miscible displacement and N2 cycle injection.
  • Supervised global petroleum engineering projects include reservoir fluid phase behavior simulation for compositional or black oil models, PVT, slim tube, special core analysis and chemical EOR.

Chemist (April 2004 – November 2006)

  • Conducted GC/HPLC analysis method development include sample preparation, test, data processing, data interpretation, process troubleshooting, evaluation and report.

Senior Reservoir Engineer (September 2002 – March 2004)

Conducted reservoir engineering evaluation and numerical simulation:

  • Built the dynamic models and run reservoir development simulation scenarios to identify, match history and predict various aspects of reservoir behavior assuming natural flow, artificial lift, gas or/and water injection, gas recycled injection, CO2 and N2 injection.
  • Evaluated depletion strategies and optimized production for reservoirs by black oil and compositional simulation studies.
  • Performed reservoir performance analysis for gas reservoir and water flood reservoir. Determined the production potential from: infill drillings, producers/injectors conversions, injection redistribution, horizontal well drillings, and oil recovery.
  • Carried out reservoir simulation studies include reservoir data collection and evaluation, model initialization, well model preparation, history matching, reservoir performance and economic evaluation using CMG reservoir simulator.

Reservoir Engineer and Project Manager (July 1989-August 2000)

Conducted and supervised projects include the setup and completion of projects, data analysis, reservoir simulation and reporting. The following are examples:

  • Performed more than ten CO2, and N2 flood design and simulation studies include reservoir data collection and evaluation, model preparation and initialization, history matching, reservoir performance and economic evaluation using CMG reservoir simulator.
  • Strong experience in gas reservoir engineering such as gas reservoir characterization, development plan, simulation, performance analysis, gas storage and gas injection.
  • Monitored reservoir performance of a CO2 and hydrocarbon miscible flood projects. Reviewed and analyzed production data and determined gas, oil and water movement. Optimized perforation intervals and mitigated gas and water coning problems.
  • Analyzed reservoir performance in water flood fields. Determined remaining reserves by decline curve analysis. Recommended producer/injector conversions.
  • Conducted to estimate the volume of hydrocarbons in place, recoverable reserves and well production potential forecast which involved in analysis and application of the rock and fluid properties, well characteristics, recovery mechanisms, material balance and fluid flow equation, well performance, decline curve analysis, productivity tests and uncertainties analysis.
  • Responsible for on-sites oil and gas production operation, built up tests, integrated reservoir characterization, formation evaluation, monitoring of water flood processes and improved well productivity by implementing appropriate stimulation techniques.
  • Conducted fluid phase behavior and special core flood experiments include the hands on fluid PVT, slim tube, hydrate, solid deposition and special core analysis.

EDUCATION

M.Sc. in Petroleum Engineering, Southwest Petroleum University, P.R.C., 1986-1989

B.Sc. in Oilfield Applied Chemistry, Southwest Petroleum University, P.R.C., 1982-1986

B.A. in Computing, Wilfrid Laurier University, Waterloo, Canada, 2000-2002

Please send me more information on this candidate

Energy Resume Energy CV Senior Geologist Experienced in Western Alberta Exploration and Development

Energy Resume Energy CV of Candidate 99118. Senior Geologist with over 25 years of diverse experience in Western Alberta. Ability to analyze and map multiple formations and generate viable drilling locations and recompletions. Proven track record in both clastic and carbonate exploration and development which has resulted in significant production and reserve additions.

Professional Experience

Major E&P CANADA

Staff Geologist, Brazeau/O’Chiese                                                                                      2001-2009

  • Recommended 25 Belly River, Ellerslie, Rock Creek, and Elkton-Shunda exploratory and development gas and oil wells resulting in a greater than 80% success rate.
  • Executed 5 recompletions in the Belly River, Viking, Notikewin, and Ellerslie resulting in over 6.5 MMcf/d IP. Two play trends were identified for more recompletions (9) and   potential development drilling.
  • Successfully recommended participation in 12 J.V. operated Belly River wells in the Columbia Harlech area. The program had greater than an 80% success rate including two oil pools totaling greater than 800,000 bbl ROIP and several gas wells.
  • Participated in 8 successful Rider Resources Ellerslie wells generating 12 MMcf/d IP.
  • Assigned to evaluate a potential Burmis Energy acquisition and received letter of commendation for services rendered.
  • Initiated and supervised summer Geologist Cardium study and successfully recommended hiring.

Senior Geologist, Southern Plains                                                                                        2001-2002

  • Recommended successful Bow Island gas recompletion.
  • Successfully supported participation in a 1 Bcf CanHunter Glauconite gas well.
  • Generated 10-15 drilling leads with 2D seismic-integrated regional Glauconite sand map.

Major Independent E&P CANADA, LTD

Senior Geologist, Exploration (West- Central Alberta) 2000-2001

  • Purchased land in Brazeau which led to successful Viking corner-shot oil wells.
  • Through industry contacts brought in successful foothills farm-in opportunity.
  • Evaluated several land sales, acquisitions, and farm-in opportunities.

Independent E&P Exploration Ltd

Contract Geologist, Wapiti Area – Deep Basin (West-Central Alberta) 1999

  • Generated several Waban and Swan Hills leads in Simonette-Karr-Gold Creek Areas.
  • Successfully purchased prospective land.
  • Evaluated several acquisition, joint venture, and farm-in opportunities.
  • Constructed regional maps for the Wabamun, Blueridge, Nisku, Leduc and Swan Hills.
  • Identified structurally controlled hydrothermal dolomization trends.

Major E&P Canada Gas Business Unit

Staff Geologist, Wapiti Area – Deep Basin (Western Alberta / Northeast BC) 1981-1999

  • Recommended a nine well Cadotte / Spirit River joint drilling program adding 20 BCF RGIP.
  • Team added 45 BCF WI RGIP and 13 MMcf/D WI annualized production in 1998.
  • Constructed regional stratigraphic & structural maps which identified new Cadotte prospects.
  • Incorporated 2D/3D seismic mapping to identify potential prospects, compartments, and drilling hazards.

Staff Geologist (Special 3-Month Project, Northwest Territories)                           1997-1998

  • Evaluated Island River, NWT Keg River dolomite play, Hossitl Field Analogy. Rejected proposal to develop and explore based on pool size and economics.

Staff Geologist, East Coast Exploration                                                                             1996-1997

  • Generated prospects, evaluated PNV’s (Whiterose, Terra Nova, Hibernia) in Jeanne d’Arc Basin contingent on West Bonne Bay commercial well results (competitors subsequently posted and purchased land).
  • Participated in well planning and operations for West Bonne Bay significant discovery well.
  • Petrophysically mapped Ben Nevis/Avalon, Hibernia, & Jeanne d’Arc formations to high-grade prospects.
  • Evaluated St. Pierre-Miquelon Sub-basin, Laurentian Shelf, West Newfoundland Cambro-Ordovician carbonate play (& Anticosti Island), Flemish Pass Sub-Basin for commercial oil potential.

Staff Geologist – Senior Geologist, Devonian Exploration                                           1987-1996

  • Mapped Hanlan / Minehead Swan Hills complexes co-supported drilling 2 development wells – 1 successful (Mobil-horizontal ;> 70 Bcf), 1 non-commercial.
  • Recommended 3 deep Stolberg Swan Hills wells and sparse 3D-encountered non-commercial gas/water bearing reef.
  • Generated several Wabamun (Beaver Creek), Nisku pinnacle, Leduc island reef prospects. Supported Narraway sparse 3D based on 2D seismic lead, resulting in accurate trap assessment.

Senior Geologist, Deep Basin Cretaceous Clastics                                                          1986-1987

  • Mapped Northeast British Columbia (Cadotte, Spirit River, Cadomin) formations.
  • Determined structural controls on Viking valley fills (Crystal, Sundance, Peco).
  • Evaluated Cardium Kakwa/Ram member.

Senior Geologist, Conventional Heavy Oil Exploitation                                                1983-1986

  • Responsible for developing and extending Lindbergh Field Lower Cummings Fm. Recommended the majority of 101 successful stacked pay conventional heavy oil wells.
  • Added Clearwater, Sparky & Colony reserves and production which were previously considered non-productive.
  • Adjusted log analysis pay criteria and worked with field personnel on completion techniques to minimize water production, resulting in a dramatic turn-around in oil production rates.

Petroleum Geologist, Cretaceous Shallow Gas Exploitation                                      1981-1983

  • Integrated mapping of Colony channels in Beauvallon area and recommended participating in a successful Dome operated well (and declined participating in 3 wells, later found to be D&A).
  • Mapped Pan-Alberta Lower Mannville Gas Contract Fields with integrated team (Calling Lake, Westlock, Hylo) to determine RGIP.
  • Coordinated land expiration project (2.7 million acres) and recommended computer database upgrades.

Geologist, Frontier-Keg River Oil Exploration                                                                              1981

  • Amoco Senex/Panny exploratory well recommendation (J&A); field discovery.

Summer Geologist, Frontier-Mackenzie Basin Field Evaluation                                           1980

Exploration Technologist, Elmworth and Whitecourt Areas                                      1976-1978

  • Wellsite geology; cross-sections and map construction

Education

Bachelor of Science (Specialization in Geology) with Distinction, 1981

University of Alberta, 2 Awards

Certificate in Petroleum Resources, 1976

Northern Alberta Institute of Technology, 2 Awards

Computer Knowledge

Accumap; Acculogs; Surfer

Petrosys

Landmark Stratworks; Zmap+;

Geolog

Memberships

Canadian Society of Petroleum Geologists (CSPG)

American Association of Petroleum Geologists (AAPG)

Association of Professional Engineers, Geologists and Geophysicists of Alberta (APEGGA)

Please send me more information on this candidate

Energy Resume Energy CV Senior Petrophysicist experienced in Uncoventional Analysis of North America

Energy Resume Energy CV of Candidate 12433.  Master’s prepared Petrophysicist experienced in unconventional analysis throughout North American.  Extensive experience in exploration and development geology, reserves determination, and reservoir delineation.

QUALIFYING EXPERIENCE:

Petrophysical analyses                                                            Reserves determination

Exploration and development geology                                   Reservoir delineation

Wellsite geologic/petrophysical supervision  Mentoring/Training lead

EMPLOYMENT HISTORY:

Canadian Major Energy Firm

Petrophysicist Specialist                       1996 – Present

Geological & Geophysical Applied Technology – Petrophysicist (2002 –present):

  • Provide petrophysical support and analyses to North American Natural Gas Business Unit, focusing on the continental USA, shale and tight gas sand prospects.
  • Technical evaluation of OGIP values for potential shale gas acquisitions in the Marcellus, Haynesville and Woodford shale prospects. Reserve calculations for existing J-sand and Niobrara carbonate oil reservoirs.

Previous Assignments:

Reservoir Management Team – Petrophysicist/Ops Geologist (1996 – 2002):

  • Well planning, geologic operations, detailed petrophysical analysis and reserves determination of Terra Nova wells. On site field supervision and data analysis incorporating wireline log, MDT/RCI pressure data, core and production test data.
  • Design and write geological, open hole wireline and LWD programs for project wells and CNOPB ADW submissions. Reservoir characterization determination studies for field simulation modeling.

Basin Operations Consortium (Offshore Newfoundland):

  • Wellsite supervision of offshore logging operations, formation evaluation analyses, MDT programming and implementation, VSP data acquisition.

Western Canada:

  • Detailed petrophysical analyses of new wells in both clastic and carbonate reservoirs. Foothills deep well carbonate basin evaluations and multi-well petrophysical evaluation of existing fields.

(Offshore Newfoundland): multi-well evaluation for reservoir and hydrocarbon development potential.

  • In addition review and evaluate new wireline and LWD technologies and analysis techniques and make recommendations for their application where suitable.
  • Taught the Suncor Introductory Log Analysis course to new hire earth scientists, engineers and technologists.

Major Independent E&P

Petrophysics and Operations Geology          1994 – 1996

  • Responsible for acquisition of well site geological data and well log evaluation for all Company interest wells drilled in Canada.
  • Supplied detailed petrophysical analyses to project geologists, production and reservoir engineers, including net pay, porosity, permeability, water contacts and reserves calculations for all Company interest wells.
  • Recommended well testing and completion strategies to senior management.
  • Initiated regional petrophysical studies to assist in carbonate and clastic prospect generation.
  • Identified additional drilling opportunities in undeveloped secondary targets for several existing fields resulting in substantial additional gas reserves.

Major E&P

Supervisor, Geologic Operations                   1989 – 1994

  • Supervised geologic operations team. Responsible for the planning, acquisition and distribution of geologic and petrophysical data on all Canada operated and company interest wells. (Typically more than 150 well locations per year)
  • Evaluated potential benefits of new logging technologies and geologic services for acquiring high quality geologic data in a safe, cost effective manner.

Petrophysical Specialist                                      1987 – 1989

  • Responsible for the design, supervision and analysis of petrophysical programs on Company operated wells.
  • Conducted detailed petrophysical analyses on Company interest wells and recommended well completion strategies.
  • Analyzed multiple well data sets to assist with prospect generation.
  • Supervised on-site logging operations for quality control.

Development Geology                                    1985 – 1987

  • Responsible for the development/exploitation of several major field areas.
  • Discovered and developed two major oil pools and a gas pool in north central Alberta.
  • Evaluated land sales and prepared government submissions for lease renewals.
  • Identified and coordinated drilling opportunities in several Alberta pools.

WELLSITE GEOLOGIST:  Independent Firm  1983 – 1985

Project Geologist                                               1980 – 1983

EDUCATION:

University of Alberta, 1979, M. Sc.

University of Waterloo, 1977, B.E.S.

PROFESSIONAL ASSOCIATIONS:

Canadian Well Logging Society          (CWLS)

Society of Professional Well Log Analysts (SPWLA)

Can. Soc. of Pet. Geologists (CSPG)

Society of Core Analysts (SCA)

SOFTWARE SKILLS:

Paradigm Geolog6, Baker Atlas eXpress, and PetroWorks log evaluation software, OpenWorks and Accumap, Unix/Linux Systems and MSOffice Suite.

REFERENCES SUPPLIED UPON REQUEST

Please send me more information on this candidate

Technology Geophysicist Jobs Calgary Canada CA

TECHNOLOGY GEOPHYSICIST JOBS

MAJOR INTERNATIONAL AND DOMESTIC OIL AND GAS EXPLORATION AND PRODUCTION COMPANY IS LOOKING FOR A SENIOR GEOPHYSICIST FOR THEIR TECHNOLOGY GROUP.

Provide technical recommendations on geophysical issues to business units for their recommendations. Assure quality of geophysical work across Exploration, Production and Development Divisions. Ensure geophysical work is carried out efficiently and delivers products aligned with required technical standards and metrics. Ensure consistency of Geoscience peer review process and document and report the results. Participate in setting of performance and competency of Geoscience staff. Coordination of training and development of technical staff together with other Senior staff. Identify and understand trends and factors impacting emerging geophysical technology.

QUALIFICATIONS

Advanced degree in Geophysics or Geoscience field. 20+years experience in the Oil and Gas industry. Exposure to multiple plays internationally and domestic seismic interpret including Deepwater. A track record of project work in Exploration, Development and Production including regional evaluation, prospect generation and risking. Strong technical competence in AVO modeling, Inversion analysis, rock properties and Physics.

Click here to apply online

Click here for more information

Visit Energy Careers Job Board

International Energy Engineering Jobs RSS Feed

International Energy Engineering Energy Resume Energy CV RSS Feed

For more information email us

Senior Geology & Geoscience Lead Geomodeler Jobs Calgary Alberta Canada CA

Senior Geology & Geoscience Modeler

Calgary Canada Our client, a leading independent oil company, is seeking an experienced G & G Modeler for the Calgary office.  Outstanding total compensation package will be offered to the selected candidate.Your key contributions to the team will be:

  • Working in a collaborative environment to develop 3D models of the multiple Formation, using the Petrel software suite, based on sound knowledge of geostatistics and modeling theory
  • Integrating geology and reservoir engineering principles into the geocellular models
  • Producing up scaled data sets of the 3D models for input into thermal flow simulators
  • Understanding key elements regarding caprock integrity
  • Keeping abreast of new oil sands knowledge and the performance of existing thermal projects
  • Championing and supporting oil sands research and development program

Our ideal candidate will have the following qualifications:

  • A Bachelor’s degree in Geosciences, a Master’s degree would be an asset
  • Be a registered Professional Geologist (or eligible to attain Professional status with APEGGA)
  • A minimum of 12 years of progressive skill development in creating and applying geomodeling to developing thermal oil recovery projects
  • Practical experience with 3D thermal reservoir modeling techniques, including a solid skill level using Petrel software
  • Solid understanding of geostatistical methods
  • Good knowledge of clastic sedimentology and stratigraphy
  • Versed in the various types of clastic depositional models
  • Good knowledge of wireline and MWD/LWD logs as well as formation evaluation
  • Experience in the interpretation and application of geophysics in constructing geological models
  • Strong ability to assess and understand the impacts of new data and react in a timely fashion
  • Excellent organizational and planning skills test and exceed established goals, schedules, and deadlines, often under tight time lines and with shifting priorities
  • Proven ability to work in a team environment dealing with people from various disciplines
  • Self Starter with a positive attitude and a bias for achieving results
  • Strong computing skills with proficiency in Microsoft Office applications
  • Candidates with SAGD knowledge will be considered highly desirable

Click here to apply online

Visit Energy Careers Job Board

International Energy Engineering Jobs RSS Feed

International Energy Engineering Energy Resume Energy CV RSS Feed

For more information email us

Senior Petrophysicist Jobs Calgary Alberta Canada CA

Senior Petrophysicist

Calgary, Canada

Our Client, a Major Independent Exploration and Production company has an opportunity for a Senior Petrophysicist with strong North American Onshore unconventional reservoirs experience. The Senior Petrophysicist will support prospect evaluation work by providing both qualitative and quantitative analysis of data relevant to formation evaluation and reservoir characterization. This evaluation work will require integration of information derived from a variety of sources including open and cased hole well logs, mud logs, sidewall cores, full cores, RFT / MDT pressure test / fluid samples, mini-fracs, Diagnostic Fracture Injectivity Tests (DFIT), geochem analysis, and the like. Additionally, the role may also perform advanced geomechanics evaluation in order to make predictions related to wellbore stability assessment, formation sanding potential, principal present-day stresses analysis, and mechanical property determination useful in defining barriers to hydraulic fracture growth. Characterization of naturally fractured reservoirs will be an important aspect of the job.

Minimum Requirements:

Viable candidates must have at least an undergraduate degree in Engineering or Geosciences and a minimum of 15 years of relevant formation evaluation experience as a Petrophysicist including significant experience in unconventional resource plays.

Click here to apply online

Visit Energy Careers Job Board

International Energy Engineering Jobs RSS Feed

International Energy Engineering Energy Resume Energy CV RSS Feed

For more information email us

CV Resume of Candidate 000927 Experienced Petrophysicist with various reservoir types including carbonate, sandstone, shaly sand and heavy oil seeking new opportunity in US or Canada

HIGHLIGHTS OF QUALIFICATIONS:

–     Petrophysicist with 10+ years experience worked in carbonate reservoir and sandstone reservoir, including 2 years as Petrophysicist in Canada and 12 years in China, 2 years as Geophysical Technician in Canada

–     Good experience in shaly sand reservoir, heavy oil carbonate reservoir and fracture identification, familiar with core analysis and interpretation

–          Skilled in well log data processing, analyzing, interpreting, and formation evaluation, including open hole and cased hole logs

–          Strong software skills in GeoGraphix and GeoFrame, as well as geoSCOUT, and Suffer

–          Calculated reservoir parameters (porosity, permeability, lithology, saturations, and net pay)

–          Skilled in constructing geological cross-sections and curve normalization

–          Three years quick interpretation experience in coal bed methane well log analysis on well-site, log data quality control and correction

–          Bachelor Degree in Geophysical Exploration

PROFESSIONAL EXPERIENCE:

Petrophysical Advisor January 2010June 2010

Major National Oil Company, Damascus, Syria

–          Conducting Tishrine and Sheikh Mansour field (672 Km2, 520+ oil wells) and Oudeh field (192 Km2, 170+ oil wells) in Syria, both are heavy oil carbonate reservoir

–          Providing formation properties and reservoir characterization for Geologist, reservoir simulation and Geophysicist

–          Writing petrophysical studying report for each well

–          Demonstrated ability to balance analyzing single wells by GeoGraphix, and setting up multi-well database by GeoFrame at the same time

–          Providing new wells and surrounding wells petrophysical parameters

–          Providing knowledge transfer and problem solving

Petrophysicist June 2008-December 2009

Tanganyika Oil Company Ltd, Calgary

–          Conducting Tishrine and Sheikh Mansour field, and Oudeh field in Syria

–          Petrophysical analysis (Processed, Analyzed 100+ wells using GeoGraphix)

–          Identifying lithology and fracture from FMI, mud logs and well logs

–          Providing formation properties and reservoir characterization for Petrel modeling, reservoir simulation and Geophysicist

–          Calibrating well log porosity and permeability using core data analysis and cutting descriptions

–          Writing petrophysical studying report for each well

–          Core Review at New Horizon Core Storage and BodyCote Labs

Geophysical Technician 2006-May 2008

Divestco Inc., Calgary

–          Archiving and indexing field, stack and basic seismic data by Indexing Tool, GAS, Media track, Aim, and DDS

–          Copying seismic data from historical media to disk system by UNIX, M5U, 9 tracks and DEMUX

–          Reformatting SEGY, SEGA, SEGD and SEGB seismic data as per client request

–          Performing ACC Verifier Project by ACC Verifier, Database, and OBS

–          Reformatting IBMTRACE Lacey file to SEGY, classifying stack data by SEGYNAMER

Petrophysicist 1993-2005

China Petroleum & Chemical Corporation (SINOPEC)

–          Wrote 100+ well log interpretation reports

–          Processed and interpreted well log data of 300+ wells including open hole and cased hole from different basins

–          Experienced in coal bed methane well log analysis in North of China

–    Determined formation properties (porosity, water saturation, net pay) in clastic reservoirs from well log interpretation and core analysis

–          Identified lithology, especially in shaly sand profile by analyzing well log data

–          Organized well log data, data QC and correction on well-site

–          Evaluated petrophysical data for well drilling completion or abandonment decisions, perforation intervals and reserves estimates

–          Picked tops and completed stratigraphic cross sections

–          Created structure map, isopach, net pay and HCPV

Well Log Technician

SINOPEC, China                                                                                                     1991-1993

–    Digitized well log curves

–    Prepared log curves and compiled reports

–    Collected core data, test data, production data and seismic data, and maintained the database

–    Scanned, classified documents and images, log data entry

–    Converted raw data to LIS and LAS files

EDUCATION:

Bachelor Degree in Geophysical Exploration                                                                 1991

Changchun University of Geology, Changchun, China

English as Second Language program                                                                2005-2006

Bow Valley College and CCIS ESL Program

Please send me more information on this candidate

Energy Resume Energy CV Senior Geophysicist MS Petroleum Engineering and Applied Geophysics Seeking Canada CA

Energy Resume Energy CV of Candidate 99120. M.Sc. in Geophysics and Petroleum Engineering. Twenty years of experience in the oil and gas industry.  Experienced in seismic processing, structural, stratigraphic, quantitative interpretation, risk analysis, reservoir characterization, reserve estimates in different trap mechanisms, structural styles and petroleum systems.  Six years of North American experience. APEGGA member.

EDUCATION

2003-2005      M.Sc. Petroleum Engineering, University of Houston, Texas

1985-1987      M.Sc. Applied Geophysics,  Ahmadu Bello University, Zaria, Nigeria

1981-1984      B.Sc. Physics, University of Lagos, Lagos, Nigeria

EXPERIENCE

Senior Geophysicist

2008 Major Independent E&P, Canada

  • Pioneered the Kingdom software application set up and used it to evaluate 50 km2 blocks in the Lower Congo Sedimentary Basin.

Senior Seismic Interpreter

1988-2007 Major E&P, Houston

  • Evaluated the Bonga North discovery seismic data and quantitative attribute analysis (SFR of 549 MMBO).
  • Evaluated 10 deepwater blocks (Top 100 Prospects & Leads) in Tertiary Niger Delta.
  • Carried out review in the southwest Mediterranean block for gas development with 2TCF SFR.
  • Evaluated the Kamunsu Cluster Basin frontier petroleum system of 2,350 km2 seismic data in Northwest Borneo.
  • Carried out Alpha and Foxtrot prospects risking and volumetric (SFR of 200 MMBO).
  • Operations Geologist for partner operated blocks drilling, resulting in savings of $2 million USD and divestment from unattractive blocks. 

Senior Geoscientist

1998-1999                   Technology Center, Houston

  • Carried out Niger Delta regional structural, stratigraphic and quantitative interpretation (1,400 Prospects & Leads) in 22 Plays in the deep offshore (prolific HC province > 100 Billion BOE).

Senior Geophysicist

1995-1998                   Nigeria

  • Carried out prospectivity of 2 partner operated blocks OPLs 211 & 316 and post drill Engule-1 (59 MMBO, 80 Bcfg), Oberan-1 (196 MMBO) wells.
  • Drilled 1 well onshore Gongola basin with sub commercial gas discovery.

Seismic Processor

1994                            Netherlands

  • Carried out Ahia Field onshore Nigeria 3D (100 km2) seismic processing.
  • Evaluated the Geopusher 3D seismic processing productivity tool.

Team Lead 2D3D Seismic Processing

1988-1993                   Nigeria

  • Processed Obote 3D (250 km2) seismic onshore Niger Delta.
  • Processed 25,000 km of 2D seismic data western Niger Delta.

COMPUTER APPLICATIONS

  • Landmark, 123DI, Kingdom, Xstream, Petrel, Strata and AVO.

PROFESSIONAL DEVELOPMENT

2009 Hampson Russell Quantitative Interpretation Course, Calgary

2009                 Seismic Data Inversion CSEG Course, Calgary

2009                 Schlumberger Petrel 2009 Course, Calgary

2009                 Geostats for Reservoir Characterization CSEG Course, Calgary

2009                 Naturally Fractured Reservoirs CSEG Course, Calgary

2009                 Petroleum Geoengineering – SEG/EAEG Course, Calgary

PROFESSIONAL ASSOCIATIONS

  • Member with APEGGA
  • Member with CSEG
  • Memberwith SPE
  • Member  with AAPG

REFERENCES

  • Available upon request.

Please send me more information on this candidate

Energy Resume Energy CV Reservoir Engineer with MBA, MS Petroleum Engineering, BS Chemical Engineering seeking Energy Opportunities

Energy Resume Energy CV of Candidate 99126.  MBA, MS Petroleum Engineering, BS Chemical Engineering.  Experienced Reservoir Engineer seeking new energy opportunities.  Expert in EOR, heavy oil, conventional, non-conventional and CBM assets.  Open to US and Canada relocation.

PROFILE:

  • 7+ years experience in reservoir engineering, simulation and numerical modeling.
  • Worked on conventional, non-conventional (EOR), heavy oil and CBM assets
  • Extensively applied reservoir engineering tools including reservoir surveillance, statistical, graphical and simulation tools. Proficiency in reservoir engineering and pattern management practices including material balance, injection optimization, conformance improvement, flood pattern surveillance, and performance forecasting.
  • Demonstrated strong technical, analytical, problem solving and project management skills.
  • Reservoir Simulation skills: Proficiency in streamline, compositional and black oil models (CMG, Eclipse, and Exodus). Specialized knowledge of CO2 miscible, thermal and heavy oil reservoir simulation model building and use.
  • Extensive exposure to oil and gas operations including drilling, completions and facilities design.
  • Experience in economic analysis, economic models and asset value assessment
  • Ability to manage multiple projects, keeping track of daily progress and associated costs and implementing cost-control measures to ensure projects are completed at or below budget.
  • Excellent communication skills (verbal, written and presentation)
  • Track record of identifying opportunities to improve reserves through new technology, reservoir analysis and management techniques.
  • Ability to interact effectively with cross-functional teams and stakeholders.
  • Experience in analysis of heavy oil reservoirs with primary, water and steam injection processes. Strong data analysis and computer skills.
  • Experience in analysis of CO2 miscible floods and other EOR mechanisms.
  • Extensive experience with asset development and reservoir management experience.
  • Demonstrated skills in data analysis and statistics,
  • Demonstrated strong team working mentoring and training skills

WORK EXPERIENCE

Supervisor, Reservoir Engineering (M.Sc., P.Eng.):

January 2004 – Present

Major Independent

  • Identify opportunities to improve asset reserves through new technology, acquisitions, optimization and proper field management techniques.
  • Design, develop and monitor multi-lateral horizontal well development plan (including reserves and economic evaluation) for a laterally discontinuous reservoir
  • Design, develop and monitor of CO2 miscible flood pilots
  • Develop a CO2 commercial development plan for several Fields
  • Successfully designed and developed heavy oil Druid field with horizontal wells-bottom water control (conning)
  • Reservoir engineering assessment of heavy oil thermal Pilot (CSS and SAGD) for field. Conducted sensitivity study for SAGD operations, including start up strategy, steam split between casing and tubing, steam chamber pressure, steam quality and injection rate.
  • Evaluated performance of SAGD versus combination of horizontal producers and vertical injectors.  Compared growth of steam chamber in gas cap and non-gas cap areas. Recommend location of the initial pilot.
  • Water flood analysis and optimization for various pools within the Western Canadian Sedimentary Basin including PTA on vertical and horizontal wells, pattern performance analysis and identifying infill drilling potential.
  • Develop and update various black oil and compositional simulation models for reservoir assessment including production history matching and phase behavior modeling for various oils and gas samples.
  • Evaluate various fields in Alberta and Saskatchewan for EOR and EGR potential
  • Evaluate reserves
  • Co-ordinate/support reservoir studies (experimental and simulation) contracted out to consultants
  • EUB/ADOE compliance related to enhanced oil recovery.
  • Provide guidance, coaching, mentorship as required to New Ventures EIT/Junior/Intermediate reservoir engineers
  • Provide general reservoir engineering/well test support.
  • Conduct in-house reservoir simulation studies for EOR projects.
  • Work with New Ventures manager to prioritize, define workflows, help establish timelines/deadlines/milestones and ensure New Ventures reservoir engineering projects are completed in a timely and appropriate fashion.
  • Oversee technical reviews of New Ventures reservoir engineering projects
  • Track New Ventures reservoir capital cost budget on regular basis – make sure we are within capital budget

Reservoir Engineer: January 2002 – January 2004

Service Company

  • Evaluate reserves.
  • Interpreting well logs and other geological data.
  • Conduct PVT analysis for chemical, hydrocarbon and CO2 miscible floods.
  • Conduct reservoir simulation studies for oil and gas clients.
  • Evaluate oil recovery from enhanced oil recovery and water flooding schemes.
  • Assess CO2 flooding potential for various pools in Alberta.
  • Analyze field performance.
  • Develop strong working relationship with clients.
  • Development of VAPEX and CSS simulation models.

Research assistant: May 2001 – Dec 2002.

University of Calgary / Imperial oil resources.

  • Developed, tested and validated a heavy oil numerical simulator.
  • Investigated the improved oil recovery in heavy oil reservoirs.
  • Developed simulation models for depletion of heavy oil reservoirs

Process Engineer: September 1998 – Dec 1999.

Small Independent.

  • Worked in a team of experience chemical engineers on the design and operation of a mixing unit
  • Acquired supervision skills by co-coordinating contract labor
  • Analyzed plant performance and recommended new opportunities
  • Employed technical expertise to trouble-shooting facility operating problems

Special Projects:

  • Developed simulation models.
  • Investigated the effect of capillary number on gas mobility during flow in reservoirs.

Key courses:

  • Reservoir engineering.
  • Reservoir simulation.
  • Phase behavior of Oil and Gas system.
  • Advance topics in heat and mass transfer.
  • Applied numerical methods
  • Well testing
  • Well logging and formation evaluation
  • Water flooding
  • Phase behavior analysis.
  • Petroleum engineering (Drilling and production operations)
  • Petroleum/chemical engineering design
  • Engineering economics.

EDUCATION

Masters of Business Administration, November 2010

Cornell-Queens MBA.

Masters of Science, Petroleum Engineering, November 2002

University of Calgary, Faculty of engineering

Bachelor of Science, Chemical Engineering, June 1998

University of Lagos, Lagos.

Please send me more information on this candidate