MacNRG Energy Careers

Search Jobs Exploration and Production Energy Resume Energy CV

Senior Reservoir Engineering Consultant Jobs in Houston

SENIOR RESERVOIR ENGINEERING CONSULTANT

HOUSTON, TEXAS

Our client, a global upstream services leader, is seeking an experience Senior Reservoir Engineering Consultant to join their Houston office.  In this key consultative role you will be responsible for various projects involving, reservoir performance analysis, field development planning, reserves estimation and auditing. In addition, you will be involved in various reservoir engineering studies employing various, cutting edge techniques.  These may involve decline curve analysis, reservoir simulation, well test analysis, material balance, PVT, EOR, CO2, SCAL data analysis, and various other unconventional methods.

The ideal candidate will have excellent communications skills for organizing, planning and presentation skills.  Bachelor’s degree in Petroleum Engineer and at least 10 years of applicable experience is required.  An advanced degree, Master’s or PhD is highly preferred.

The selected candidate will be offered an exceptional total compensation package including base, annual incentive and comprehensive benefits including relocation assistance, 401k, etc.

 

Click here to apply online

 

Visit Energy Careers Job Board

International Energy Engineering Jobs RSS Feed

International Energy Engineering Resume CV RSS Feed

For more information email us

 

Call us (713) 861-8656 ext. 111

 

Senior Geomodeler Jobs Houston Texas TX

SENIOR GEOMODELER

HOUSTON, TEXAS

Apply your advanced education and experience as a Senior Geomodeler for a leading Energy Company in Houston, Texas.

Using your advance knowledge you will be responsible for the following:

* working with geologists, geophysicists, petrophysicists and reservoir engineers to evaluate and assure the quality of model input data and interpretations;

* performing or evaluating core analysis and core description for facies /rock type determination;

* building structural and stratigraphic frameworks that accurately capture flow unit/flow barrier architecture;

* performing 1-D to 3-D petrophysical modeling of facies/rock types, porosity, initial water saturation, and permeability;

* building multiple model realizations and scenarios to evaluate uncertainty and related risk in reserves distributions,

* working closely with reservoir simulation engineers to appropriately upscale and history match models, 

* working with development geologists, reservoir engineers, and drilling engineers to optimize development planning and project execution.

The successful candidate will work cooperatively within a multi-disciplinary, integrated team, will proactively plan and undertake reservoir characterization studies and development planning activities, will effectively communicate information and evaluations to team members and management in a timely manner, and will be a mentor to other disciplines. Expertise or working knowledge of sequence stratigraphic analysis, structural analysis, geophysical mapping, petrophysical analysis, 3D reservoir modeling, field development planning, and uncertainty and risk management.

To be considered for this opportunity you must possess the following required qualifications:
* Advanced Degree in Geology (M.Sc. or Ph.D.) with 15 years of oil & gas industry experience
* 3 years of advanced experience in 3D geological modeling, preferably in Petrel
* Experience in integrating core, well log, geophysical, petrophysical, production, and engineering data into a coherent framework
* Experience in core analysis and description, lithofacies analysis, and rock typing
* Understanding of geostatistics and fundamental geostatistical algorithms as well as data and interpretation uncertainties and their influence on modeling and business decisions 

* Experience in probabilistic and multi-scenario reserves estimation
* Ability to work well within an integrated multi-disciplinary team
* Ability to communicate information and evaluations both written and oral
* Ability to manage multiple projects simultaneously
* Good business acumen
* International travel required

The following additional qualifications are preferred:

  

* Experience with EOR methods helpful
* Experience with carbonate and/or fractured reservoirs (e.g., DFN modeling)

 

Click here to apply online

  

 Visit Energy Careers Job Board 

International Energy Engineering Jobs RSS Feed

International Energy Engineering Energy Resume Energy CV RSS Feed

For more information email us

Energy Resume Energy CV Senior Reservoir Engineer with extensive Modeling, Reservoir Simulation, EOR, IOR Experience Seeking Gulf Coast Area Opportunities

Energy Resume Energy CV of Candidate 99123.  Senior Reservoir Engineer with extensive, modeling, reservoir simulation, EOR and IOR experience seeking new career opportunities in the Gulf Coast.

HIGHLIGHTS OF QUALIFICATIONS

  • 18 years of broad-based experience in oil and gas reservoir engineering.
  • Experienced with modeling, numerical simulation, reservoir performance analysis, optimization of fields, development planning, economic evaluation, forecast production and reserve estimation.
  • Substantial experience in EOR/IOR techniques including sweep conformance, CO2 flood and chemical flood such as polymer, Gel, CDG, foam, surfactant and SP/ASP.
  • Skilled at conventional reservoir engineering techniques including reservoir characterization, volumetric analysis, material balance, reservoir fluid phase behavior, decline-curve, well test, PVT, special core analysis, sold deposition and integrated reservoir studies.
  • Strong CMG, IPM (REVEAL), UTCHEM, ECLIPSE, MS-Office and programming experience.

PROFESSIONAL EXPERIENCE

Senior Reservoir Engineer (March 2008- Present)

  • Perform various reservoir engineering projects for major oil companies such as Chevron, BP, Shell, OXY, Woodside (Australia), Husky (Canada) and Rosneft (Russia).
  • Primarily be responsible for reservoir engineering analysis and evaluation, project design, modeling and simulation for water flood and chemical IOR/EOR.
  • Review field performance with regard to recovery and production efficiencies. Diagnose poor sweep efficiency of water flood. Find out solutions of sweep conformance, Evaluate alternative development schemes in operated fields from perspective of recovery and production.
  • Plan and design lab tests such as core flood and slim tube for water shut off and profile control.
  • Responsible for reservoir performance analysis of mature water flood field. Conducted design and process implementation of sweep conformance projects. Successfully developed criteria and simulation methods for BrightWater sweep conformance new technology.
  • Built reservoir dynamic model and run simulation for water flood and BrightWater projects.
  • Conducted customer service and business development by reservoir engineering technology support and consultation.

Senior Reservoir Engineer and Project Manager (November 2006 – March 2008)

  • Supervised projects to usage of petroleum engineering protocols consisting of project planning, data interpretation, process troubleshooting, quality assessment/quality control and reporting.
  • Carried out feasibility studies for various EOR schemes include CO2 flood, water and chemical flood, hydrocarbon miscible displacement and N2 cycle injection.
  • Supervised global petroleum engineering projects include reservoir fluid phase behavior simulation for compositional or black oil models, PVT, slim tube, special core analysis and chemical EOR.

Chemist (April 2004 – November 2006)

  • Conducted GC/HPLC analysis method development include sample preparation, test, data processing, data interpretation, process troubleshooting, evaluation and report.

Senior Reservoir Engineer (September 2002 – March 2004)

Conducted reservoir engineering evaluation and numerical simulation:

  • Built the dynamic models and run reservoir development simulation scenarios to identify, match history and predict various aspects of reservoir behavior assuming natural flow, artificial lift, gas or/and water injection, gas recycled injection, CO2 and N2 injection.
  • Evaluated depletion strategies and optimized production for reservoirs by black oil and compositional simulation studies.
  • Performed reservoir performance analysis for gas reservoir and water flood reservoir. Determined the production potential from: infill drillings, producers/injectors conversions, injection redistribution, horizontal well drillings, and oil recovery.
  • Carried out reservoir simulation studies include reservoir data collection and evaluation, model initialization, well model preparation, history matching, reservoir performance and economic evaluation using CMG reservoir simulator.

Reservoir Engineer and Project Manager (July 1989-August 2000)

Conducted and supervised projects include the setup and completion of projects, data analysis, reservoir simulation and reporting. The following are examples:

  • Performed more than ten CO2, and N2 flood design and simulation studies include reservoir data collection and evaluation, model preparation and initialization, history matching, reservoir performance and economic evaluation using CMG reservoir simulator.
  • Strong experience in gas reservoir engineering such as gas reservoir characterization, development plan, simulation, performance analysis, gas storage and gas injection.
  • Monitored reservoir performance of a CO2 and hydrocarbon miscible flood projects. Reviewed and analyzed production data and determined gas, oil and water movement. Optimized perforation intervals and mitigated gas and water coning problems.
  • Analyzed reservoir performance in water flood fields. Determined remaining reserves by decline curve analysis. Recommended producer/injector conversions.
  • Conducted to estimate the volume of hydrocarbons in place, recoverable reserves and well production potential forecast which involved in analysis and application of the rock and fluid properties, well characteristics, recovery mechanisms, material balance and fluid flow equation, well performance, decline curve analysis, productivity tests and uncertainties analysis.
  • Responsible for on-sites oil and gas production operation, built up tests, integrated reservoir characterization, formation evaluation, monitoring of water flood processes and improved well productivity by implementing appropriate stimulation techniques.
  • Conducted fluid phase behavior and special core flood experiments include the hands on fluid PVT, slim tube, hydrate, solid deposition and special core analysis.

EDUCATION

M.Sc. in Petroleum Engineering, Southwest Petroleum University, P.R.C., 1986-1989

B.Sc. in Oilfield Applied Chemistry, Southwest Petroleum University, P.R.C., 1982-1986

B.A. in Computing, Wilfrid Laurier University, Waterloo, Canada, 2000-2002

Please send me more information on this candidate

Energy Resume Energy CV Houston Based Advanced Reservoir Simulation Engineer PhD Bilingual German Open to International Relocation

Energy Resume Energy CV of Candidate 6345.  A highly motivated, results-oriented reservoir engineering consultant with 27 years of domestic and international experience.  Extensive experience in general reservoir engineering, including PVT/EOS fluid characterization, nodal analysis, gas fields, and gas storage.  Specialist knowledge in all aspects of simulation technology including its application, and in the physical and mathematical fundamentals.  Contributions helped lead to significant dollars savings in project developments in Brazil, Qatar, Nigeria and Indonesia.

Knowledge and skills

¨     Reservoir engineering fundamentals and practice

¨     Reservoir simulation applications, compositional modeling

¨     PVT Analysis

¨     Well Tubing Analysis

¨     Gas Storage

¨     Small Business Management

Professional Experience

Major Energy Corporation                                                                         2005-2010
Senior Reservoir Engineering Advisor – Houston, Texas

Reservoir engineering for development in Brazil.

¨     Ongoing reservoir management for the reservoir in the  field in Brazil.  Worked with a team of geoscientists, drillers, and completion engineers to optimize reservoir development.  Successfully proposed water injection location based on modeling work to delay water breakthrough while still providing needed pressure support to increase production.   Recommendations have contributed to the reservoir performing significantly beyond expectations.

¨     Developed a simulation model for the carbonate reservoir in the field.   One of the main issues was the natural fracture system, which was implemented both in a Dual Permeability/Dual Porosity mode and with an enhanced Single Porosity representation.  The model is currently in the history matching phase, but has reached a level where it has been applied to locate two infill wells to be drilled  in 2010.

¨     Evaluation of (Equatorial Guinea) light oil reservoirs for company working with major energy firm, the operator of the field.   Prime focus was on operating issues, such as well locations and gas/water injection, and developing strategies for increased ultimate recovery.  Constructed three Eclipse reservoir models as a tool for discussions with the operator.   Along with other members of the team, influenced partner to modify the project development with positive results for wells.

¨     Evaluation of property in Equatorial Guinea.   Compositional and economical analyses carried out which influenced the operator in the ongoing appraisal of the field.

¨     Appraised and proposed well development plan for the Green Sand in Equatorial Guinea, which was an important component to the block being declared commercial.

¨     Mentored three summer interns, all of whom selected employment at company.  Assisted and mentored new reservoir engineers from other departments in their studies.

¨     Applications were implemented using primarily the Eclipse simulator with support from Prosper, MBAL, and PVTSIM software.

Large Energy Engineering Firm                        2000-2004
Reservoir Engineering Consultant –  Texas

¨     Completed an appraisal of a marginal oil field in Nigeria for an Energy firm.  Lead role on a team with a seismologist, a petrophysics expert, and a production engineer to evaluate a property with three well completions and 3-D seismic data.  Appraisal using CMG simulation software led to a proposed development plan, which was estimated to lead to production of 18 million barrels as compared to 0.5 million that was actually produced from the three original wells.

¨     Completed analysis of NGL production for the reservoir (gas condensate) for the energy operator.  Updated one previous model and generated a scoping model for a new reservoir. Three separate reservoir simulation models were then run under one surface control to provide compositional profiles from the produced gas stream.  A detailed compositional history match was carried out on each of the three reservoirs to validate the predictions.  The results were used to evaluate whether an upgrade in processing surface facilities would be necessary in order to eliminate the gas flare.  The model also provided an improved estimate of future NGL production.

¨     Completed update of study for Energy Corporation.  With a lead role on a team of geoscientists and engineers, updated previous models with information from 146 new well perforations.  Carried out analysis of well hydraulics to identify limiting factors on production.  Revised fluid characterization for the reservoir which helped explain declining reservoir performance.  Submitted new findings to a simulation model, which now achieved a significantly improved history match with the new data, and completed an evaluation of future development for the field.  The uplift in recovery (400 million barrels), along with the uplift from nearby reservoirs, justified the funding of the East Area project, an extensive investment (over $1 billion) in gas injection and surface facilities.

¨     Completed an EOS/1-D compositional scoping analysis using the CMG simulation software for a Joint Operating Company in Vietnam.  After guiding the selection of PVT experiments at Core Labs, an EOS model was developed which closely matched the experimental data.  The EOS model was then applied in a scoping simulation to evaluate the effectiveness of dry gas injection at different pressures, recycled gas injection, water injection, and depletion.  The work allowed development planning while an appraisal/exploration program was being carried out.

¨     Completed an evaluation of a gas storage reservoir in Oregon to assist the land owners in obtaining a fair market rental from the gas storage operator.  The storage capacity and deliverability was first evaluated by carrying out a history match of pressure, water-contact advance, and water production.  This information was then applied in a proprietary program to evaluate the fair economic value.

¨     Consulted for Large Energy Operator in the Middle East on a relatively thin oil rim (100 feet), volatile oil with a large, rich gas condensate zone.  Proposed a relocation of the wells to develop the oil rim first.  This prognosis was then verified in a reservoir simulation model.  The revision led to an estimated increase of 75 million barrels in oil recovery, 12 fewer wells drilled, and a deferment of gas compression, all of which significantly improved the project’s economics.

¨     Consulted/assisted on several ongoing engineering projects.  Work contributed to project approvals for(Intermediate and Deep) water injection, and to the (volatile oil depletion) and (gas/water injection) developments.

¨     Provided engineering software support for fields, which included the North Field in the Middle East and several Nigerian reservoirs.

–     Made modifications to the code to meet specific field requirements.

–     Provided the support necessary to bring the simulation studies to a successful conclusion.

¨     Consulted for the Major oil company in Russia.  Served in a mentoring role with several Russian engineers using the Eclipse simulator in developing a large model for the Luginesk field.  Purpose of the study was to modify the reservoir strategy of water injection in a field with a large primary gas cap.

¨     Managed a small engineering consulting firm, which entailed the handling of tax issues, unemployment, payroll, accounting, invoicing, and marketing.

Large Energy Corporation

Exploration and Producing Technology Co.                                                     1989-2000

Reservoir Engineering Consultant –  Texas

¨     Consulted as reservoir engineering/simulation expert on major reservoir studies during the period 1990-99.  Guided the construction of models and consulted on interpretation of results.  Work contributed to major project revisions, which significantly reduced well and surface facilities costs, and in one case, added 200 million barrels of reserves.

¨     Served as team lead on maintenance and support team of proprietary simulation software.  Made significant contributions to program capabilities to meet company’s modeling needs in the field, and provided user support.  Company’s simulation software and expertise had been effectively applied on over 50 of its major oil and gas assets worldwide.

¨     Consulted as reservoir engineer on non-simulation projects.  Frequently reviewed work and conclusions presented by company partners which lessened company’s risk in multi-million dollar projects.

¨     Designed and delivered regular reservoir simulation courses at company’s affiliate sites.  Courses always received high ratings by the participants.  In addition, trained over sixty engineers one-on-one in simulation technology.

¨     Developed part of the code and mathematical algorithms used in properitary software.

Internationl Energy Corporation – German Division                                             1985-1989

Staff Reservoir Engineer – Germany

¨     Provided engineering expertise and documentation for company’s case in an equity dispute that was eventually resolved with company’s gaining its previously estimated share (90%) of the reserves.

¨     Conducted reservoir engineering studies to help determine future development of oil and gas fields.  Applied classical reservoir engineering, well test technology, and simulation techniques that contributed to one of company’s most profitable affiliates.

Major Energy Research and Development Corp.                                                                       1981-1985

Research Engineer – Texas

¨     Created two-dimensional chemical flooding/polymer simulator using the finite element method.  This simulator was applied in several research projects.

RESERVOIR EVALUATIONS PERFORMED

¨     Taiwan TCS Gas Storage: Led a team of engineers to convert a 1.3 Tscf gas-producing field to gas storage.  Application of 13 horizontal and 6 deviated wells for 660 tons/hour up to 1500 tons/hour deliverability.  Results: Determined cushion gas requirements and the number and locations of new wells for each deliverability scenario.  The analysis accounted for an active aquifer.

¨     Qatar North Field: Lean gas condensate, 10-30 Tscf in different project areas, 15 wells initially in project area, over 150 wells in total field, compositional model, 6-10 components.  Results: project design to meet deliverability for gas-sales contracts, minimize H2S production to delay $600 million investment by several years, predict condensate recovery given different field development scenarios.

¨     Indonesia Arun Field: Gas condensate (78 barrels/MMscf), 20 Tscf in place, 100 wells, compositional model, 9 components, surface facilities model coupled to the reservoir.  Results: matched pressure, CGR, water vapor, CO2, and stabilized condensate over 25 years of history, model used to optimize surface facilities and reduce expenditures by $100 million.

¨     Nigeria Asabo and Isobo Fields: Light oil, 660  and 415 million barrels, black oil model.  Results: pressures, GOR and water cut matched over 30-year production history.  Study showed a 15-20% increase in recovery using gas injection, which has been recently planned for both fields.

¨     Norway Smorbukk South: Volatile oil, 400 million barrels, compositional model, 7 components.  Results: indicated effectiveness of gas injection.  Project was initiated in combination with other fields in the area.

¨     Norway Kristin Field, Qatar North Field, and Indonesia Madura and NSO Fields: Compositional tubing analysis coupled with reservoir simulation for evaluation of corrosion.  Tubing model determined water, CO2, H2S distribution, velocities, film thickness, and other parameters affecting corrosion.  Results:analysis indicated that L80 carbon steel was sufficient in the North Field, Madura, and NSO saving $1 million per well. In Kristin, higher quality steel was shown to be required.

¨     Germany Söhlingen Schneverdingen, Söhlingen Dethlingen, Siedenburg Staffhorst: dry gas, hydraulic fracturing (Dethlingen), water-drive (Schneverdingen) – reservoir modeling.

Education:

Ph.D. in Applied Mechanics, California Institute of Technology

B.S. in Civil Engineering,University of Notre Dame

B.A. in History,University of Notre Dame

Computer Skills:

Reservoir Engineering Software – Petrel, Eclipse, CMG, PVT software

PC-based word processing, spreadsheet, graphics

XP and UNIX environments

Language:

Foreign language fluency – German

PUBLICATIONS:

Available on request

Please send me more information on this candidate

Energy Resume Energy CV Experienced Bilingual Spanish Reservoir Engineer MBA Open to International Opportunities

Energy Resume Energy CV of Candidate 10401. Twelve 12 year Reservoir Engineer versed in Production Engineering as well. Primary focus on economic evaluation for major projects in deep water, onshore, conventional and unconventional areas. Complete understanding of all aspects of Reservoir Engineering. Willing to consider opportunity globally.

EXPEREINCE:

Major Worldwide E&P, Calgary, Canada

Feb 2006-Current

Reservoir Engineering –Deep Basin Unconventional Gas

June 2009 – current

  • Project Manager for unconventional resources. Responsible for the capital execution of the development and exploration capital budget.
  • Responsible for the development plan and economic evaluation of holdings for major field.
  • Managed all exploration and development projects in Alberta and British Columbia.
  • Responsible for mineral land continuation packages and land expiries.

Reservoir Engineering –Shallow Gas

July 2007 – June 2009

  • Responsible for all shallow gas activities within the SE Alberta, for several formations.
  • Project manager for Shallow Gas drilling program, consisting of 98 wells at 28 M$ gross
  • Responsible for budget management, technical and economic analysis of all shallow gas initiatives (operated and non-operated).

Production Engineering

Feb 2006-July 2007

  • Performed decline curve analysis and pool studies to manage well recompletions.
  • Run IPR analysis to optimize well production. Evaluated and recommended artificial lift systems.
  • Booked reserves based on volumetrics, decline curve analysis and offsetting well trends.
  • Managed the inactive well project, making decision on reactivation, recompletion or abandonment of all wells.

Achievements: Completed the Shallow Gas program in record time and under budget.

Major Software Development Company, Calgary

2005-2006

Business Analysis – Mosaic application

  • Provided customer support (economic evaluation and reserves booking) for the Mosaic product, including database conversion, installation, initial setup and general support.
  • Run economic evaluations for clients (Shiningbank, Provident)
  • Provided input to the development team for testing and new functionality for Mosaic.

Achievements: Helped to establish a great product image by providing outstanding customer service.

Mid Sized E&P Argentina SA, Buenos Aires, Argentina

2004-2005

Economic Evaluations

  • Performed deterministic and stochastic economic evaluations for existing assets (onshore and offshore) and for new ventures.
  • Optimized corporate-wide portfolio evaluation system and asset evaluation model using risk analysis techniques.
  • Trained and mentor junior staff in statistics, valuation, cash flow analysis and risk analysis.

Achievements: By optimizing the economic evaluations process, its frequency was reduced fromonce every two months to once every month. Mentored and trained employees who are now responsible for project evaluations.

Business Plans Development

  • Developed business plans for oil & gas upstream assets worth 300 MUS$ in a multidisciplinary team environment, working closely with geologists, reservoir engineers, facilities engineers and accountants.
  • Presented business plans to Board of Directors along with capital budget requirements for approval.

Achievements: Created business plans for exploratory and producing key producing assets and presented to the Board of Directors.

Major International Service Company, Buenos Aires , Argentina

2000-2003

Business Analyst

  • Managed and upgraded a Linear Programming and Mixed Integer Programming model (86k equations and 215k variables) to optimize and analyze business cases and produce budget forecasts (monthly, yearly, and 5-year).
  • Created and managed econometric models (time series analysis) to forecast natural gas consumption, using historical data and economic variables.

Achievements: Managed a complex simulation model, challenging historic business paradigms and provided innovative solutions and business practices. The Team won the 2003 Commercial award, competing with projects from  worldwide assets.

Major International E&P, Argentina

1998-2000

Production engineering – Artificial lift systems

  • Selected artificial lift systems for high temperature, high gas-oil ratio applications.
  • Analyzed IPR curves and reported performance on a monthly basis.
  • Managed 15 oil wells with average productivity of 2,800 bopd per well.
  • On multidisciplinary teams to increase oil production and lower lifting cost.
  • Co-responsible for production improvement program, including re-perforation, acid stimulation and bottom hole equipment optimization.

Achievements: Valued member of multidisciplinary team committed to improve extraction conditions.  Extended life-in-hole from 4 weeks to 4 months. Solved gas locking and corrosion pump failures.

Surface Facilities

  • Assisted Exploitation Manager in dealing with oil plants and compressor station operation. Duties included coordination of 6 – 8 maintenance crews, 3 construction contractors, and responsibility for hot operations inside plant premises.

Achievements: Proved a “dependable team worker, who faced a huge challenge in managing day-today plant operations when it was most needed” as quoted by former Exploitation Manager.

Education:

Mechanical Engineer, 1998

ITBA, Buenos Aires Institute of Technology

MBA, 2002

CEMA University, Buenos Aires, Argentina

Please send me more information on this candidate

Reservoir Engineer Jobs San Antonio Texas TX

Reservoir Engineer

San Antonio Texas $160K – $180K

Our client, an active operator in the Texas Panhandle and Western Oklahoma, is seeking an experienced Reservoir Engineer for their office in San Antonio, Texas.

The job duties and responsibilities will be as follows:

  • Reservoir management including volumetrics and pressure transient analysis to estimate reserves and characterize various reservoirs to define proper spacing of horizontal wells
  • Perform nodal analysis studies to optimize artificial lift methods on operated wells
  • Perform decline analysis and reserve determination
  • Complete economic runs to determine the viability of various farm out and acquisition scenarios
  • Coordinate core analysis and PVT analysis on developing plays
  • Additional experience with production operations and drilling is a plus

Experience and skills required:

  • BS in Petroleum Engineering, Mechanical Engineering or Chemical Engineering
  • Minimum of 10 years of industry experience with a minimum of five years in applicable reservoir engineering positions and duties.
  • Must be able to work autonomously and identify as well as develop and execute various reservoir projects.  Must also be able to work in conjunction with production and drilling departments in identifying drill candidates and well optimization candidates
  • Experience with WIM, Prosper, Aries and Powertools or comparable programs a strong plus

Selected candidate would be eligible for employer matched 401K, incentive bonus plan, free gym membership and half day Fridays.  Excellent medical/dental program.

Click here to apply online

Visit Energy Careers Job Board

International Energy Engineering Jobs RSS Feed

International Energy Engineering Energy Resume Energy CV RSS Feed

For more information email us